Main Extensions
WaterOne provides the design, cost estimate, and installation of all new water mains when petitioned by a landowner or developer. All water mains must be installed by WaterOne or its contractor. Anyone requiring a water main extension or upgrade must enter into a Main Extension and Petition Agreement with WaterOne prior to installation.
Types of Main Extension Agreements
Nonrefunding Main Extension Agreements are typically used for water mains to be installed within the interior of a subdivision or development. The cost of the water main extension is not refundable to the Petitioner.
Benefit Area Main Extension Agreements may be used for water mains which are installed to serve the Petitioner's property and can also serve property other than that owned by the Petitioner, and ensure a well-gridded system. The cost of the water main extension is prorated, typically based on the property footage adjacent to the new water main extension. A share of the cost can be collected from other property owners, based on front footage, as other property owners connect, directly or indirectly, to the water main. Footage charges collected will then be refunded to the Petitioner. Refund Area Agreements will terminate after a maximum of 20 years.
The Main Extension Process
It is WaterOne's goal to complete Water Main Extension designs, including a cost estimate, and to forward agreement documents and easement documents to the Petitioner within 60 days of receipt of all information.
Benefit Area Water Main Extensions typically take an additional 30 days to complete, and involve another 30 days notification period to affected landowners.
After all documents have been executed by the Petitioner and an appropriate deposit of the estimated cost of the water main extension with WaterOne in the form of a check or letter of credit is provided to WaterOne, staff will produce construction drawings. Once site readiness criteria has been met, WaterOne construction inspectors can schedule the project for construction. Before a project can be scheduled, WaterOne must have a signed and sealed set of civil plans. Upon completion of the water main extension, WaterOne will determine the final cost of construction and invoice or refund the Petitioner accordingly.
Questions? Contact Us!
Questions About Main Extension Design & Construction
Elizabeth Maloney, P.E., Lead Development Engineer
Email Elizabeth Maloney
Phone: 913-895-5764
Questions About Main Extension Contract Execution
Janie Frye, Administrative Assistant
Email Janie Frye
Phone: 913-895-5741
Questions About Easements
Bert Mattis, Right-Of-Way Technician
Email Bert Mattis
Phone: 913-895-5737