WaterOne will be upgrading existing 2 inch, 8 inch and 6 inch PVC (install date: 1976) to a 12 inch PVC water main along Quivira Road between 151st Street and 159th Street.
WaterOne will be upgrading infrastructure along Mission Road between 79th Street and 84th Street.