WaterOne will be upgrading 2,650' of infrastructure along 104th Street at Benson including its connecting cul-de-sacs, as well as a connecting portion of Eby street south of 103rd Street.
WaterOne will be upgrading infrastructure along Granada Street from 59th Street to 63rd Street.
WaterOne will be upgrading infrastructure along Fontana Street from 59th Street to 62nd Street.
WaterOne will be upgrading 5300' of infrastructure along Roe Avenue between 67th St. and 75th St.
WaterOne is working to restore the channel on a section of the Kansas River east of its cofferdam weir near I435 and Holliday Drive.
WaterOne will be upgrading 2,300' of infrastructure along Antioch Road between 102nd Terrace and 96th Street.
WaterOne's contractor Kissick Construction will be upgrading 3,463' of infrastructure along Flint Road between 62nd Terrace and Johnson Drive.